Shandong Yankuang Group 300,000 Tons Caprolactam Project

  • Shandong Yankuang Group 300,000 Tons Caprolactam Project (4)
  • Shandong Yankuang Group 300,000 Tons Caprolactam Project (5)
  • Shandong Yankuang Group 300,000 Tons Caprolactam Project (6)
  • Shandong Yankuang Group 300,000 Tons Caprolactam Project (7)
  • Shandong Yankuang Group 300,000 Tons Caprolactam Project (8)
  • Shandong Yankuang Group 300,000 Tons Caprolactam Project (9)
  • Shandong Yankuang Group 300,000 Tons Caprolactam Project (10)
  • Shandong Yankuang Group 300,000 Tons Caprolactam Project (11)
  • Shandong Yankuang Group 300,000 Tons Caprolactam Project (12)
  • Shandong Yankuang Group 300,000 Tons Caprolactam Project (13)
  • Shandong Yankuang Group 300,000 Tons Caprolactam Project (14)
  • Shandong Yankuang Group 300,000 Tons Caprolactam Project (1)
  • Shandong Yankuang Group 300,000 Tons Caprolactam Project (2)
  • Shandong Yankuang Group 300,000 Tons Caprolactam Project (3)

The Shandong Yankuang Group’s 300,000-ton/year caprolactam project Lunan Chemical Plant is located in Tengzhou, Shandong Province. During the initial
engineering camp construction bidding process in 2019, we introduced to our customers a new model of overall delivery of camp construction ,Deeply loved by customers.

In the end, the client resolutely abandoned the original old method of purchasing temporary construction houses, and packaged the construction of the entire camp to Chengdong. From overall camp planning, camp product design, material production and processing, to indoor and outdoor supporting material procurement and
transportation, and on-site construction.

On the one hand, the production of housing products is done in the factory, and on the other hand, the entire elite team is quickly organized to prepare to go to
the front line of the construction site after the Spring Festival of the Year of the Rat.

At a critical moment, a major global disaster-the new corona epidemic has occurred, but all difficulties cannot hold us back. On March 8, the project team of our
company faced the huge risk of the epidemic and started construction on site.

The construction process under the epidemic is difficult, but the final results are encouraging. In terms of camp planning and design, we follow the new concept of
camp construction, quality, humanization, intelligence, and greenization to complete it. . In terms of room type selection, in accordance with customers’ needs for
large-span centralized office areas, except for the smart chemical site exhibition hall, which is constructed with H steel structure due to its high height and large span, the rest of the room types are constructed with Chengdong’s patented new ZA products. The entire temporary office camp is composed of office buildings, meeting rooms, restaurants, porches, and exhibition halls. It covers an area of land 8,625 square meters, including 3,741 square meters of buildings.