Camp introduction

The total area of ​​the Tiebu Expressway project camp is about 55,600 square meters. The main building area functions cover three aspects: office, life and production,
including work and office areas, living and accommodation areas, catering areas, entertainment areas, oil areas, and equipment maintenance There are eight areas,
including the area, material warehouse area, and central test area.

The building covers an area of ​​about 4200 square meters. The south side of the camp is the production area, and the north side is the office, accommodation, catering,
and entertainment activities. The construction area of ​​the production area is approximately 1,210 square meters, the construction area of ​​the office area is approximately
1,264 square meters, and the construction area of ​​the living, dining and entertainment area is approximately 1,726 square meters.

Jinsen Ligustrum green plants are planted on both sides of the hardened road, and grass seeds are planted in a reasonable area, which not only embellishes the space
with green vegetation, creates a comfortable landscaping living environment, but also makes the best use of rainwater to prevent soil erosion.

The office and living buildings in the camp are provided and installed by Chengdong camp.

The production area, accommodation area and office area adopt flexible hardening width and hardening methods according to the different needs of road functions.

Fire extinguishers are installed in office buildings, staff accommodation areas, kitchens, restaurants, laboratories, warehouses and other locations. Set up fire-fighting
sand pits in important areas such as warehouses, oil depots, and laboratories, prohibit fireworks, and post warning signs.

Domestic garbage in the camp accommodation area and office area, and construction garbage generated in the production area shall be classified and treated.

The enclosed wall of the camp is 3 meters high, painted with blue and white paint, and the road and bridge LOGO is hung on the column. The overall appearance is
coordinated. The gate adopts a single-sided eight-meter iron door, which is safe and strong.