Nepal Healthcare Hospital Project

  • Nepal Healthcare Hospital Project (12)
  • Nepal Healthcare Hospital Project (5)
  • Nepal Healthcare Hospital Project (13)
  • Nepal Healthcare Hospital Project (4)
  • Nepal Healthcare Hospital Project (6)
  • Nepal Healthcare Hospital Project (7)
  • Nepal Healthcare Hospital Project (8)
  • Nepal Healthcare Hospital Project (9)
  • Nepal Healthcare Hospital Project (10)
  • Nepal Healthcare Hospital Project (11)
  • Nepal Healthcare Hospital Project (1)
  • Nepal Healthcare Hospital Project (2)
  • Nepal Healthcare Hospital Project (3)

Solution

1. Appearance
Adopting the ZA house structure, the overall color tone with white walls and blue roof, combined with the actual use situation, use steel doors and install anti-theft nets and other security measures.

2. House structure
The structure is all galvanized parts which can meet the requirements of appearance and function.

3. Fire protection
The structure is sprayed with fire-resistant paint and the maintenance material is made of Class A fire-resistant glass wool to meet the fire protection requirements.

4. Logistic and Construction
Provide a complete set of transportation plans for sea, land and bulk cargo transportation, as well as installation instructions with graphics and text instructions, installation video and on-site installation instructions helping customers to complete the construction site work well.