The 10,000-person camp project of the second phase of the Zhiliatangote refinery

  • The 10,000-person camp project of the second phase of the Zhiliatangote refinery (3)
  • The 10,000-person camp project of the second phase of the Zhiliatangote refinery (1)
  • The 10,000-person camp project of the second phase of the Zhiliatangote refinery (4)
  • The 10,000-person camp project of the second phase of the Zhiliatangote refinery (5)
  • The 10,000-person camp project of the second phase of the Zhiliatangote refinery (10)
  • The 10,000-person camp project of the second phase of the Zhiliatangote refinery (8)
  • The 10,000-person camp project of the second phase of the Zhiliatangote refinery (2)
  • The 10,000-person camp project of the second phase of the Zhiliatangote refinery (6)
  • The 10,000-person camp project of the second phase of the Zhiliatangote refinery (7)
  • The 10,000-person camp project of the second phase of the Zhiliatangote refinery (9)
  • The 10,000-person camp project of the second phase of the Zhiliatangote refinery (11)
  • The 10,000-person camp project of the second phase of the Zhiliatangote refinery (12)
  • The 10,000-person camp project of the second phase of the Zhiliatangote refinery (13)
  • The 10,000-person camp project of the second phase of the Zhiliatangote refinery (14)
  • The 10,000-person camp project of the second phase of the Zhiliatangote refinery (15)

Camp Overview

The room types of this project are mainly accommodation camps, which have high standards for anti-corrosion, wind resistance, airtightness, fire prevention, safety, and
convenient installation.

All accommodation types of the project are LZA rooms, indoor corridors, complete facilities, distribution boxes are also provided by our company, the circuit is
prefabricated in the factory in advance, and the installation is convenient.

The hospital adopts Chengdong’s self-developed frame system of the new ZA room type, complete supporting facilities, reliable structure, weather durability, structure
hot-dip galvanized anti-corrosion treatment, good corrosion resistance, and can adapt to various climatic conditions such as oceanic climate and tropical rain forest Wait.
Sealing, the structural frame is placed on the inner side of the wall top plate, and the wall top plate is seamlessly spliced, and the sealing performance is good. Standard
parts are connected by bolts, no painting, no pollution, no welding on site, avoiding excessive use of labor and mechanical equipment.

This project took 120 days to complete (raw material procurement, production and processing, collection of supporting goods, factory shipment) more than 70,000
square meters of required goods (395 40-foot high container containers). The houses that have been put into use on site have been highly praised by customers. It also laid
a solid foundation for the further cooperation between Chengdong and the richest man in Africa!